Pages
Download article

Investigation of the Pilot Industrial Works Efficiency on the Infill Well Spacing on the Bashkirian Deposits of Sokolkinsky Field with the Use of the Geological‑Technological Model

A.G. Khabibrakhmanov1, I.N. Khakimzyanov2, R.I. Sheshdirov2

Original article

DOI https://doi.org/10.18599/grs.19.3.22

292-300
rus.
eng.

open access

Under a Creative Commons license

In this paper, to assess the effectiveness of pilot industrial works on the infill well spacing in the Bashkirian deposits of Sokolkinsky field, factors affecting the final technological indicators are identified. It is possible to refer the following factors to such category: the number of simultaneously commissioned wells in the element; selection of the optimal development element (five-point, nine-point, etc.); organization of the reservoir pressure maintenance system (the ratio of production and injection wells); the time interval for the reservoir pressure maintenance system in the development element. The proof of this fact is the results analysis of the three options considered, which makes it possible to determine how the development system, the ratio of production and injection wells, and the time of wells transfer for injection affect the production of oil.

infill well spacing, pilot industrial works, development element, flow filtration lines, interference, efficiency, geological-technological model

  • Abdulmazitov R.G. Povyshenie effektivnosti razrabotki zalezhei s trudnoizvlekaemymi zapasami: dis. dokt. tekhn. nauk [Increasing the development efficiency of deposits with hard-to-recover reserves: Dr. tech. sci. diss.]. Ufa. 2004. (In Russ.)
  • Dopolnenie k tekhnologicheskoi skheme razrabotki Sokolkinskogo neftyanogo mestorozhdeniya [Addition to the technological scheme for the development of the Sokolkinskoye oil field]. Institute «TatNIPIneft». Kuznetsova A.A., Salakhova S.N. Bugulma. 2015. 315 p. (In Russ.)
  • Zakirov S.N. Analiz problemy «Plotnost’ setki skvazhin – nefteotdacha» [Analysis of the problem “Density of the well grid – oil recovery”]. Moscow: “Graal” Publ. 2002. 316 p. (In Russ.)
  • Obobshchenie opyta razrabotki melkikh mestorozhdenii (NGDU «Nurlatneft’» i «Yamashneft’») [Experience generalization of the development of small deposits (NGDU Nurlatneft and Yamashneft]. Institute «TatNIPIneft». Bakirov I.M. Bugulma. 2005. 1 book – 335 p., 2 book – 211 p. (In Russ.)
  • Pereschet zapasov nefti i TEO KIN Sokolkinskogo mestorozhdeniya (Prudkovskoe podnyatie). Tatarskoe geologorazvedochnoe upravlenie: Otchet [Recalculation of oil reserves and feasibility study of KIN of the Sokolkinsky field (Prudkovsky uplift). atar Geological Exploration Department: Report]. Akhmanova L.G. Kazan. 2009. 166 p. (In Russ.)
  • Takhautdinov Sh.F., Slivchenko F.F., Khisamov R.S., Yusupov I.G., Zalyatov M.Sh. Dependence of oil recovery on the well grid density. Neftyanoe khozyaistvo = Oil industry. 2009. No. 3. Pp. 34-36. (In Russ.)
  • Shchelkachev V.N. On the confirmation of a simplified formula that estimates the effect of the well grid density on oil recovery. Neftyanoe khozyaistvo = Oil industry. 1984. No. 1. Pp. 26-30. (In Russ.)

1Oil and Gas Production Department «Elkhovneft» Tatneft PJSC, Almetyevsk, Russia
2Institute TatNIPIneft Tatneft PJSC, Bugulma, Russia

For citation:

Khabibrakhmanov A.G., Khakimzyanov I.N., Sheshdirov R.I. Investigation of the Pilot Industrial Works Efficiency on the Infill Well Spacing on the Bashkirian Deposits of Sokolkinsky Field with the Use of the Geological‑Technological Model. Georesursy = Georesources. 2017. V. 19. No. 3. Part 2. Pp. 292-300. DOI: https://doi.org/10.18599/grs.19.3.22